{"id":3030,"date":"2026-06-15T11:00:38","date_gmt":"2026-06-15T15:00:38","guid":{"rendered":"https:\/\/arpenteurgatineau.ca\/?p=3030"},"modified":"2026-07-14T11:15:07","modified_gmt":"2026-07-14T15:15:07","slug":"parceling-plan-vs-site-plan-whats-the-difference-and-why-does-it-matter-for-your-project","status":"publish","type":"post","link":"https:\/\/arpenteurgatineau.ca\/en\/blogue-en\/parceling-plan-vs-site-plan-whats-the-difference-and-why-does-it-matter-for-your-project\/","title":{"rendered":"Parceling Plan vs. Site Plan: What&#8217;s the Difference and Why Does It Matter for Your Project?"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">A <\/span><b>parceling plan<\/b><span style=\"font-weight: 400;\"> and a <\/span><b>site plan<\/b><span style=\"font-weight: 400;\"> are prepared at different stages of a real estate project. A parceling plan is used to create or modify lots (the cadastral layout), while a site plan determines where a building will be located on an existing lot. Confusing the two can delay a project, result in an incomplete municipal application, or require certain steps to be repeated.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">This confusion often arises when a property owner purchases land, plans to build a home, or wants to subdivide a property. The real question is not, &#8220;Which plan is better?&#8221; but rather, &#8220;Which plan is appropriate for my project?&#8221; At <\/span><b>Alary, St-Pierre &amp; Durocher<\/b><span style=\"font-weight: 400;\">, this assessment is carried out as soon as the mandate begins so that every client is directed toward the appropriate process before any official applications are submitted.<\/span><\/p>\n<h2><b>Parceling Plan\u2014Subdivide First to Support Future Development<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">A <\/span><a href=\"https:\/\/arpenteurgatineau.ca\/en\/services\/cadastre\/\"><b>parceling plan<\/b><\/a><span style=\"font-weight: 400;\"> is not used to authorize construction. Its purpose is to create lots on which construction may eventually take place.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">When a property owner wishes to divide a large property into several new lots, the municipality must first determine whether the proposed configuration complies with its planning and development regulations. This is precisely the role of a parceling plan.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Among other things, this document illustrates:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">the proposed boundaries of the new lots and the existing lot boundaries;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">the area and dimensions of each lot;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">proposed buildings and access points;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">existing or proposed easements, where applicable;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">the regulatory constraints that will apply to each lot.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">This information allows the municipality to verify that every proposed lot will comply with subdivision requirements before it is officially created.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">In Gatineau, subdivision standards are established through municipal planning regulations, including zoning and subdivision by-laws. These regulations define minimum lot sizes, frontage requirements, access requirements, and many other development criteria. Any proposal that does not comply with these requirements must be revised before it can move forward.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">A parceling plan is commonly required in the following situations:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">a developer purchases a large parcel intended for several new homes;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">a property owner wishes to sell part of their land;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">an estate is being divided among several heirs;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">an existing lot must be reconfigured to allow for a new development project.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">In other words, until the future lots have been defined and determined to be compliant, no meaningful development can begin. The parceling plan therefore forms the foundation upon which the entire real estate project is built.<\/span><\/p>\n<h2><b>Site Plan\u2014The Key to Obtaining Your Building Permit<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Once a lot has been created\u2014or if it already exists\u2014the focus changes completely. The question is no longer how to divide a property but where a building can be constructed while complying with municipal regulations.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">That is exactly what<\/span> <span style=\"font-weight: 400;\">a <\/span><a href=\"https:\/\/arpenteurgatineau.ca\/en\/services\/site-plan\/\"><b>site plan<\/b><\/a><span style=\"font-weight: 400;\"> is designed to demonstrate. It illustrates the proposed building on the property and confirms that its location complies with the applicable requirements before a building permit is issued.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Unlike a parceling plan, which focuses on the subdivision of the land, a site plan focuses on how the lot will be developed. It typically shows:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">the proposed location of the principal building;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">the required front, side, and rear setbacks (the minimum distances from the property lines);<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">existing or proposed accessory buildings;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">easements and restricted areas affecting the property;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">certain physical features that may influence the project, depending on the circumstances.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">This document enables the municipality to quickly determine whether the proposed project complies with applicable planning regulations before authorizing construction. The review generally includes setback requirements, lot coverage, known easements, and any other regulations that apply to the property&#8217;s zoning and the nature of the project.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">In practice, a site plan is required for most new residential construction projects as well as many major additions. Without this document, the municipality does not have the information it needs to confirm that the proposed building can legally be constructed in the planned location.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">This step also helps prevent costly problems. Discovering after construction has begun that a building encroaches into a required setback or does not comply with zoning requirements can lead to significant modifications, project delays, and, in some cases, the need to redesign the project entirely.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">A site plan is therefore much more than a simple drawing. Before the first shovel goes into the ground, it demonstrates that the proposed project complies with municipal regulations and that the building permit can be issued on a compliant basis.<\/span><\/p>\n<h2><b>When Do You Need One, the Other, or Both?<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">The easiest way to understand the difference is to follow the sequence of a real estate project. Each plan serves a specific purpose and comes into play at the appropriate stage.<\/span><\/p>\n<h3><b>Are you purchasing an existing registered lot to build a house?<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">In this case, a parceling plan is generally not required because the lot already exists. Instead, a site plan will demonstrate that the proposed home complies with municipal requirements so that a building permit can be issued.<\/span><\/p>\n<h3><b>Do you want to subdivide your property to sell part of the land?<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">The project begins with a parceling plan. The proposed lot configuration must first be approved before the new lots can be officially created. If one of those lots will later be developed, a site plan will then be prepared as part of the building permit application.<\/span><\/p>\n<h3><b>Are you developing a property for multiple homes?<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">The process generally unfolds in two phases. First, the <\/span><b>parceling plan<\/b><span style=\"font-weight: 400;\"> establishes the future lots, their dimensions, and their compliance with municipal requirements. Once that step has been completed, each proposed building will require its own <\/span><b>site plan<\/b><span style=\"font-weight: 400;\"> when a building permit is requested.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">This sequence is important because each document answers a different question:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Can the property be subdivided this way?<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Can the building be constructed in this location?<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">In many projects, the two plans are therefore complementary rather than interchangeable. One prepares the land for future development, while the other confirms that the proposed construction complies with the regulations that apply to the newly created or existing lot.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Understanding this distinction from the very beginning helps avoid unnecessary steps and ensures your project starts with the right document at the right time.<\/span><\/p>\n<h2><b>The Right First Step: Call Your Land Surveyor<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">A parceling plan and a site plan each serve a specific purpose. However, when a project is still in the planning stage, it is not always obvious which document is actually required. A property owner may assume that a site plan will be sufficient when the property first needs to be subdivided. Conversely, some people begin the parceling process when a site plan would already meet their needs.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Clarifying this at the outset helps avoid delays, incomplete applications, and unnecessary expenses. A brief discussion at the beginning of the project is often all it takes to quickly determine the appropriate approach based on the property, the owner&#8217;s objectives, and the municipality&#8217;s requirements.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">At <\/span><a href=\"https:\/\/arpenteurgatineau.ca\/en\/\"><span style=\"font-weight: 400;\">Alary, St-Pierre &amp; Durocher<\/span><\/a><span style=\"font-weight: 400;\">, your land surveying firm in Gatineau, this assessment is an integral part of the guidance provided to property owners, developers, and contractors throughout the region. The goal is not simply to prepare a plan but to identify from the very beginning which one will allow your project to move forward efficiently.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Are you planning a construction, subdivision, or development project? Contact Alary, St-Pierre &amp; Durocher or <\/span><a href=\"https:\/\/arpenteurgatineau.ca\/en\/free-quotation\/\"><span style=\"font-weight: 400;\">request a quote<\/span><\/a><span style=\"font-weight: 400;\"> to determine which plan is the right fit for your project.<\/span><\/p>\n<h2><b>FAQ\u2019s<\/b><\/h2>\n<h3><b>What Is the Difference Between a Parceling Plan and a Site Plan?<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">A parceling plan is used to create, modify, or reconfigure lots in preparation for a development project. A site plan applies to an existing lot and shows where a building will be constructed to demonstrate compliance with municipal requirements before a building permit is issued.<\/span><\/p>\n<h3><b>Do I Need a Site Plan to Obtain a Building Permit in Gatineau?<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">For most new residential construction projects and many major additions, yes. A <\/span><b>site plan<\/b><span style=\"font-weight: 400;\"> allows the municipality to verify that the proposed building complies with setback requirements, property line clearances, and other applicable regulations before issuing a building permit.<\/span><\/p>\n<h3><b>Can a Parceling Plan and a Site Plan Be Prepared at the Same Time?<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">It depends on the project. When a property must first be subdivided, the <\/span><b>parceling plan<\/b><span style=\"font-weight: 400;\"> generally comes before the <\/span><b>site plan<\/b><span style=\"font-weight: 400;\">. However, some projects can be planned in a coordinated manner to streamline the subsequent stages of development.<\/span><\/p>\n<h3><b>How Long Does It Take to Prepare a Project Plan?<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">The timeline varies depending on the complexity of the property, the field survey work required, the available documentation, and the verifications needed with the municipality. A development project involving multiple new lots generally requires more preparation than a <\/span><b>site plan<\/b><span style=\"font-weight: 400;\"> for a single-family home.<\/span><\/p>\n<h3><b>Does the Land Surveyor Communicate Directly with the Municipality?<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">For most municipalities in the Outaouais region, the land surveyor can prepare the technical documents, respond to requests for additional information, and communicate directly with municipal officials to help facilitate the review of the file. This collaboration helps reduce misunderstandings and delays related to regulatory requirements.<\/span><\/p>\n<h3><b>Who Can Tell Me Which Plan I Need?<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">If you are unsure whether your project requires a parceling plan or a site plan, the best first step is to <\/span><a href=\"https:\/\/arpenteurgatineau.ca\/en\/contact-us\/\"><span style=\"font-weight: 400;\">consult a land surveyor<\/span><\/a><span style=\"font-weight: 400;\"> before beginning the process. An assessment of your property and your project objectives will generally identify the appropriate document and the steps that will follow.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A parceling plan and a site plan are prepared at different stages of a real estate project. A parceling plan is used to create or modify lots (the cadastral layout), while a site plan determines where a building will be located on an existing lot. Confusing the two can delay a project, result in an&hellip; <a class=\"more-link\" href=\"https:\/\/arpenteurgatineau.ca\/en\/blogue-en\/parceling-plan-vs-site-plan-whats-the-difference-and-why-does-it-matter-for-your-project\/\">Continue reading <span class=\"screen-reader-text\">Parceling Plan vs. Site Plan: What&#8217;s the Difference and Why Does It Matter for Your Project?<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":3028,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[15],"tags":[23,22,53,54],"class_list":["post-3030","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blogue-en","tag-land-surveyor","tag-land-surveyor-in-gatineau","tag-parceling-plan","tag-site-plan","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Parceling Plan vs. Site Plan in Gatineau: What&#039;s the Difference?<\/title>\n<meta name=\"description\" content=\"Parceling plan or site plan? Learn which plan your project requires to avoid delays and properly prepare your application in Gatineau.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/arpenteurgatineau.ca\/en\/blogue-en\/parceling-plan-vs-site-plan-whats-the-difference-and-why-does-it-matter-for-your-project\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Parceling Plan vs. Site Plan in Gatineau: What&#039;s the Difference?\" \/>\n<meta property=\"og:description\" content=\"Parceling plan or site plan? Learn which plan your project requires to avoid delays and properly prepare your application in Gatineau.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/arpenteurgatineau.ca\/en\/blogue-en\/parceling-plan-vs-site-plan-whats-the-difference-and-why-does-it-matter-for-your-project\/\" \/>\n<meta property=\"og:site_name\" content=\"ASDAG - Alary, St-Pierre &amp; Durocher Arpenteurs-G\u00e9om\u00e8tres depuis 1954\" \/>\n<meta property=\"article:published_time\" content=\"2026-06-15T15:00:38+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-07-14T15:15:07+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/arpenteurgatineau.ca\/wp-content\/uploads\/2026\/07\/lotissement-asdag.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1000\" \/>\n\t<meta property=\"og:image:height\" content=\"1790\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"pop\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"pop\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/arpenteurgatineau.ca\\\/en\\\/blogue-en\\\/parceling-plan-vs-site-plan-whats-the-difference-and-why-does-it-matter-for-your-project\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/arpenteurgatineau.ca\\\/en\\\/blogue-en\\\/parceling-plan-vs-site-plan-whats-the-difference-and-why-does-it-matter-for-your-project\\\/\"},\"author\":{\"name\":\"pop\",\"@id\":\"https:\\\/\\\/arpenteurgatineau.ca\\\/#\\\/schema\\\/person\\\/1ee90c3d5ebd8003da61bdd103857f56\"},\"headline\":\"Parceling Plan vs. Site Plan: What&#8217;s the Difference and Why Does It Matter for Your Project?\",\"datePublished\":\"2026-06-15T15:00:38+00:00\",\"dateModified\":\"2026-07-14T15:15:07+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/arpenteurgatineau.ca\\\/en\\\/blogue-en\\\/parceling-plan-vs-site-plan-whats-the-difference-and-why-does-it-matter-for-your-project\\\/\"},\"wordCount\":1579,\"image\":{\"@id\":\"https:\\\/\\\/arpenteurgatineau.ca\\\/en\\\/blogue-en\\\/parceling-plan-vs-site-plan-whats-the-difference-and-why-does-it-matter-for-your-project\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/arpenteurgatineau.ca\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/lotissement-asdag.png\",\"keywords\":[\"land surveyor\",\"land surveyor in Gatineau\",\"parceling plan\",\"site plan\"],\"articleSection\":[\"blogue\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/arpenteurgatineau.ca\\\/en\\\/blogue-en\\\/parceling-plan-vs-site-plan-whats-the-difference-and-why-does-it-matter-for-your-project\\\/\",\"url\":\"https:\\\/\\\/arpenteurgatineau.ca\\\/en\\\/blogue-en\\\/parceling-plan-vs-site-plan-whats-the-difference-and-why-does-it-matter-for-your-project\\\/\",\"name\":\"Parceling Plan vs. Site Plan in Gatineau: What's the Difference?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/arpenteurgatineau.ca\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/arpenteurgatineau.ca\\\/en\\\/blogue-en\\\/parceling-plan-vs-site-plan-whats-the-difference-and-why-does-it-matter-for-your-project\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/arpenteurgatineau.ca\\\/en\\\/blogue-en\\\/parceling-plan-vs-site-plan-whats-the-difference-and-why-does-it-matter-for-your-project\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/arpenteurgatineau.ca\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/lotissement-asdag.png\",\"datePublished\":\"2026-06-15T15:00:38+00:00\",\"dateModified\":\"2026-07-14T15:15:07+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/arpenteurgatineau.ca\\\/#\\\/schema\\\/person\\\/1ee90c3d5ebd8003da61bdd103857f56\"},\"description\":\"Parceling plan or site plan? Learn which plan your project requires to avoid delays and properly prepare your application in Gatineau.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/arpenteurgatineau.ca\\\/en\\\/blogue-en\\\/parceling-plan-vs-site-plan-whats-the-difference-and-why-does-it-matter-for-your-project\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/arpenteurgatineau.ca\\\/en\\\/blogue-en\\\/parceling-plan-vs-site-plan-whats-the-difference-and-why-does-it-matter-for-your-project\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/arpenteurgatineau.ca\\\/en\\\/blogue-en\\\/parceling-plan-vs-site-plan-whats-the-difference-and-why-does-it-matter-for-your-project\\\/#primaryimage\",\"url\":\"https:\\\/\\\/arpenteurgatineau.ca\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/lotissement-asdag.png\",\"contentUrl\":\"https:\\\/\\\/arpenteurgatineau.ca\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/lotissement-asdag.png\",\"width\":1000,\"height\":1790,\"caption\":\"Plan projet de lotissement (cadastre) ou plan projet d\u2019implantation\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/arpenteurgatineau.ca\\\/en\\\/blogue-en\\\/parceling-plan-vs-site-plan-whats-the-difference-and-why-does-it-matter-for-your-project\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\\\/\\\/arpenteurgatineau.ca\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Parceling Plan vs. Site Plan: What&rsquo;s the Difference and Why Does It Matter for Your Project?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/arpenteurgatineau.ca\\\/#website\",\"url\":\"https:\\\/\\\/arpenteurgatineau.ca\\\/\",\"name\":\"ASDAG - Alary, St-Pierre &amp; Durocher Arpenteurs-G\u00e9om\u00e8tres depuis 1954\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/arpenteurgatineau.ca\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/arpenteurgatineau.ca\\\/#\\\/schema\\\/person\\\/1ee90c3d5ebd8003da61bdd103857f56\",\"name\":\"pop\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/2f962f579ee0540f1ddbcaddcb3388f0c0583482a41dfb2260438556e90eeb2b?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/2f962f579ee0540f1ddbcaddcb3388f0c0583482a41dfb2260438556e90eeb2b?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/2f962f579ee0540f1ddbcaddcb3388f0c0583482a41dfb2260438556e90eeb2b?s=96&d=mm&r=g\",\"caption\":\"pop\"},\"url\":\"https:\\\/\\\/arpenteurgatineau.ca\\\/en\\\/author\\\/pop\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Parceling Plan vs. Site Plan in Gatineau: What's the Difference?","description":"Parceling plan or site plan? Learn which plan your project requires to avoid delays and properly prepare your application in Gatineau.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/arpenteurgatineau.ca\/en\/blogue-en\/parceling-plan-vs-site-plan-whats-the-difference-and-why-does-it-matter-for-your-project\/","og_locale":"en_US","og_type":"article","og_title":"Parceling Plan vs. Site Plan in Gatineau: What's the Difference?","og_description":"Parceling plan or site plan? Learn which plan your project requires to avoid delays and properly prepare your application in Gatineau.","og_url":"https:\/\/arpenteurgatineau.ca\/en\/blogue-en\/parceling-plan-vs-site-plan-whats-the-difference-and-why-does-it-matter-for-your-project\/","og_site_name":"ASDAG - Alary, St-Pierre &amp; Durocher Arpenteurs-G\u00e9om\u00e8tres depuis 1954","article_published_time":"2026-06-15T15:00:38+00:00","article_modified_time":"2026-07-14T15:15:07+00:00","og_image":[{"width":1000,"height":1790,"url":"https:\/\/arpenteurgatineau.ca\/wp-content\/uploads\/2026\/07\/lotissement-asdag.png","type":"image\/png"}],"author":"pop","twitter_card":"summary_large_image","twitter_misc":{"Written by":"pop","Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/arpenteurgatineau.ca\/en\/blogue-en\/parceling-plan-vs-site-plan-whats-the-difference-and-why-does-it-matter-for-your-project\/#article","isPartOf":{"@id":"https:\/\/arpenteurgatineau.ca\/en\/blogue-en\/parceling-plan-vs-site-plan-whats-the-difference-and-why-does-it-matter-for-your-project\/"},"author":{"name":"pop","@id":"https:\/\/arpenteurgatineau.ca\/#\/schema\/person\/1ee90c3d5ebd8003da61bdd103857f56"},"headline":"Parceling Plan vs. Site Plan: What&#8217;s the Difference and Why Does It Matter for Your Project?","datePublished":"2026-06-15T15:00:38+00:00","dateModified":"2026-07-14T15:15:07+00:00","mainEntityOfPage":{"@id":"https:\/\/arpenteurgatineau.ca\/en\/blogue-en\/parceling-plan-vs-site-plan-whats-the-difference-and-why-does-it-matter-for-your-project\/"},"wordCount":1579,"image":{"@id":"https:\/\/arpenteurgatineau.ca\/en\/blogue-en\/parceling-plan-vs-site-plan-whats-the-difference-and-why-does-it-matter-for-your-project\/#primaryimage"},"thumbnailUrl":"https:\/\/arpenteurgatineau.ca\/wp-content\/uploads\/2026\/07\/lotissement-asdag.png","keywords":["land surveyor","land surveyor in Gatineau","parceling plan","site plan"],"articleSection":["blogue"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/arpenteurgatineau.ca\/en\/blogue-en\/parceling-plan-vs-site-plan-whats-the-difference-and-why-does-it-matter-for-your-project\/","url":"https:\/\/arpenteurgatineau.ca\/en\/blogue-en\/parceling-plan-vs-site-plan-whats-the-difference-and-why-does-it-matter-for-your-project\/","name":"Parceling Plan vs. Site Plan in Gatineau: What's the Difference?","isPartOf":{"@id":"https:\/\/arpenteurgatineau.ca\/#website"},"primaryImageOfPage":{"@id":"https:\/\/arpenteurgatineau.ca\/en\/blogue-en\/parceling-plan-vs-site-plan-whats-the-difference-and-why-does-it-matter-for-your-project\/#primaryimage"},"image":{"@id":"https:\/\/arpenteurgatineau.ca\/en\/blogue-en\/parceling-plan-vs-site-plan-whats-the-difference-and-why-does-it-matter-for-your-project\/#primaryimage"},"thumbnailUrl":"https:\/\/arpenteurgatineau.ca\/wp-content\/uploads\/2026\/07\/lotissement-asdag.png","datePublished":"2026-06-15T15:00:38+00:00","dateModified":"2026-07-14T15:15:07+00:00","author":{"@id":"https:\/\/arpenteurgatineau.ca\/#\/schema\/person\/1ee90c3d5ebd8003da61bdd103857f56"},"description":"Parceling plan or site plan? Learn which plan your project requires to avoid delays and properly prepare your application in Gatineau.","breadcrumb":{"@id":"https:\/\/arpenteurgatineau.ca\/en\/blogue-en\/parceling-plan-vs-site-plan-whats-the-difference-and-why-does-it-matter-for-your-project\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/arpenteurgatineau.ca\/en\/blogue-en\/parceling-plan-vs-site-plan-whats-the-difference-and-why-does-it-matter-for-your-project\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/arpenteurgatineau.ca\/en\/blogue-en\/parceling-plan-vs-site-plan-whats-the-difference-and-why-does-it-matter-for-your-project\/#primaryimage","url":"https:\/\/arpenteurgatineau.ca\/wp-content\/uploads\/2026\/07\/lotissement-asdag.png","contentUrl":"https:\/\/arpenteurgatineau.ca\/wp-content\/uploads\/2026\/07\/lotissement-asdag.png","width":1000,"height":1790,"caption":"Plan projet de lotissement (cadastre) ou plan projet d\u2019implantation"},{"@type":"BreadcrumbList","@id":"https:\/\/arpenteurgatineau.ca\/en\/blogue-en\/parceling-plan-vs-site-plan-whats-the-difference-and-why-does-it-matter-for-your-project\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/arpenteurgatineau.ca\/en\/"},{"@type":"ListItem","position":2,"name":"Parceling Plan vs. Site Plan: What&rsquo;s the Difference and Why Does It Matter for Your Project?"}]},{"@type":"WebSite","@id":"https:\/\/arpenteurgatineau.ca\/#website","url":"https:\/\/arpenteurgatineau.ca\/","name":"ASDAG - Alary, St-Pierre &amp; Durocher Arpenteurs-G\u00e9om\u00e8tres depuis 1954","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/arpenteurgatineau.ca\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/arpenteurgatineau.ca\/#\/schema\/person\/1ee90c3d5ebd8003da61bdd103857f56","name":"pop","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/2f962f579ee0540f1ddbcaddcb3388f0c0583482a41dfb2260438556e90eeb2b?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/2f962f579ee0540f1ddbcaddcb3388f0c0583482a41dfb2260438556e90eeb2b?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/2f962f579ee0540f1ddbcaddcb3388f0c0583482a41dfb2260438556e90eeb2b?s=96&d=mm&r=g","caption":"pop"},"url":"https:\/\/arpenteurgatineau.ca\/en\/author\/pop\/"}]}},"_links":{"self":[{"href":"https:\/\/arpenteurgatineau.ca\/en\/wp-json\/wp\/v2\/posts\/3030","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/arpenteurgatineau.ca\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/arpenteurgatineau.ca\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/arpenteurgatineau.ca\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/arpenteurgatineau.ca\/en\/wp-json\/wp\/v2\/comments?post=3030"}],"version-history":[{"count":1,"href":"https:\/\/arpenteurgatineau.ca\/en\/wp-json\/wp\/v2\/posts\/3030\/revisions"}],"predecessor-version":[{"id":3031,"href":"https:\/\/arpenteurgatineau.ca\/en\/wp-json\/wp\/v2\/posts\/3030\/revisions\/3031"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/arpenteurgatineau.ca\/en\/wp-json\/wp\/v2\/media\/3028"}],"wp:attachment":[{"href":"https:\/\/arpenteurgatineau.ca\/en\/wp-json\/wp\/v2\/media?parent=3030"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/arpenteurgatineau.ca\/en\/wp-json\/wp\/v2\/categories?post=3030"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/arpenteurgatineau.ca\/en\/wp-json\/wp\/v2\/tags?post=3030"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}